CHAPTER 277a*
PUBLIC UTILITY ENVIRONMENTAL STANDARDS ACT
*Applicability of chapter discussed. 165 C. 687. Cited. 177 C. 623, 624; 180 C. 474, 477. Conn. public utility environmental standards act, Sec. 16-50g et seq. cited. 212 C. 157, 159. Public utility environmental standards act (Secs. 16-50g
16-50z) cited. 215 C. 474, 482, 483. Cited. 220 C. 516, 518.
Sec. 16-50g et seq., Public utility environmental standards act (PUESA) cited. 20 CA 474, 476478, 485, 487, 489.
Cited. 37 CA 653, 662; judgment reversed, see 238 C. 361 et seq.
Attempted taking of easement for future facility where procedure prescribed by this chapter was not followed was an
abuse of the plaintiff's powers of eminent domain. 35 CS 303, 306, 310.
Table of Contents
Sec. 16-50g. Legislative finding and purpose.
Sec. 16-50h. Short title.
Sec. 16-50i. Definitions.
Sec. 16-50j. Connecticut Siting Council. Regulations. Consultation with state agencies.
Sec. 16-50k. Certificate of environmental compatibility and public need. Transfer. Amendment. Excepted matters. Waiver.
Sec. 16-50l. Application for certificate. Notice. Application or resolution for amendment of certificate.
Sec. 16-50m. Public hearing. Notice.
Sec. 16-50n. Parties to a certification or amendment proceeding or a declaratory ruling. Grouping of parties. Intervenors. Counsel and consultant to council. Limited appearances.
Sec. 16-50o. Record of hearing. Rights of parties.
Sec. 16-50p. Certification proceeding decisions: Timing, opinion, factors considered. Telecommunications and community antenna television facilities: Additional factors considered, conditions. Modification of location. Amendment proceeding decisions. Service and notice.
Sec. 16-50q. Judicial review.
Sec. 16-50r. Report of forecast of loads and resources. Confidential Information. Regulations. Investigation of life-cycle costs for overhead and underground transmission lines: Scope, hearings, consultants, assessment.
Sec. 16-50s. Expenditures by utilities as consideration in proceedings.
Sec. 16-50t. Regulations and standards. Hearing. Certain expenditures excluded in computation of fair net return.
Sec. 16-50u. Enforcement of certificate and standards requirements.
Sec. 16-50v. Administration expenses. Assessments. Fees. Staff. Consultants. Studies.
Sec. 16-50w. Conflicting provisions.
Sec. 16-50x. Exclusive jurisdiction of council; exception. Eminent domain after certification. Municipal regulation of proposed location.
Sec. 16-50y. Location application for electric generating facilities.
Sec. 16-50z. Acquisition of real property for transmission facility. Regulations. Public service company acquisition of residential real property by condemnation.
Sec. 16-50aa. Tower sharing: Policy, requests, feasibility proceeding, compensation, expenses.
The legislature finds that power
generating plants and transmission lines for electricity and fuels, community antenna
television towers and telecommunication towers have had a significant impact on the
environment and ecology of the state of Connecticut; and that continued operation and
development of such power plants, lines and towers, if not properly planned and controlled, could adversely affect the quality of the environment, the ecological, scenic,
historic and recreational values of the state. The purposes of this chapter are: To provide
for the balancing of the need for adequate and reliable public utility services at the lowest
reasonable cost to consumers with the need to protect the environment and ecology of
the state and to minimize damage to scenic, historic, and recreational values; to provide
environmental quality standards and criteria for the location, design, construction and
operation of facilities for the furnishing of public utility services at least as stringent as
the federal environmental quality standards and criteria, and technically sufficient to
assure the welfare and protection of the people of the state; to encourage research to
develop new and improved methods of generating, storing and transmitting electricity
and fuel and of transmitting and receiving television and telecommunications with minimal damage to the environment and other values described above; to promote the sharing
of towers for fair consideration wherever technically, legally, environmentally and economically feasible to avoid the unnecessary proliferation of towers in the state particularly where installation of such towers would adversely impact class I and II watershed
lands, and aquifers; to require annual forecasts of the demand for electric power, together
with identification and advance planning of the facilities needed to supply that demand
and to facilitate local, regional, state-wide and interstate planning to implement the
foregoing purposes.
(1971, P.A. 575, S. 1; P.A. 75-375, S. 1, 12; P.A. 76-359, S. 1, 7; P.A. 77-218, S. 1; P.A. 89-45, S. 1, 4.)
History: P.A. 75-375 deleted "orderly processes" with regard to balancing utility services and environmental concerns
and modified reference provision to utility services with "at the lowest reasonable cost to consumers"; P.A. 76-359 included
in purposes of chapter provision re forecasts of power demands and advance planning for necessary facilities; P.A. 77-
218 included references to community cable television and telecommunications services and facilities; P.A. 89-45 included
provision of chapter re promotion of sharing of towers.
Cited. 180 C. 474, 477.
Cited. 20 CA 474, 485, 489.
Cited. 35 CS 303, 306.
This chapter shall be known and may be cited and referred
to as the "Public Utility Environmental Standards Act".
(1971, P.A. 575, S. 2.)
As used in this chapter:
(a) "Facility" means: (1) An electric transmission line of a design capacity of sixty-
nine kilovolts or more, including associated equipment but not including a transmission
line tap, as defined in subsection (e) of this section; (2) a fuel transmission facility,
except a gas transmission line having a design capability of less than two hundred pounds
per square inch gauge pressure; (3) any electric generating or storage facility using
any fuel, including nuclear materials, including associated equipment for furnishing
electricity but not including an emergency generating device, as defined in subsection
(f) of this section or a facility (i) owned and operated by a private power producer, as
defined in section 16-243b, (ii) which is a qualifying small power production facility
or a qualifying cogeneration facility under the Public Utility Regulatory Policies Act
of 1978, as amended, or a facility determined by the council to be primarily for a producer's own use and (iii) which has, in the case of a facility utilizing renewable energy
sources, a generating capacity of one megawatt of electricity or less and, in the case
of a facility utilizing cogeneration technology, a generating capacity of twenty-five
megawatts of electricity or less; (4) any electric substation or switchyard designed to
change or regulate the voltage of electricity at sixty-nine kilovolts or more or to connect
two or more electric circuits at such voltage, which substation or switchyard may have
a substantial adverse environmental effect, as determined by the council established
under section 16-50j, and other facilities which may have a substantial adverse environmental effect as the council may, by regulation, prescribe; (5) such community antenna
television towers and head-end structures, including associated equipment, which may
have a substantial adverse environmental effect, as said council shall, by regulation,
prescribe; and (6) such telecommunication towers, including associated telecommunications equipment, owned or operated by the state, a public service company or a certified telecommunications provider or used in a cellular system, as defined in the Code
of Federal Regulations Title 47, Part 22, as amended, which may have a substantial
adverse environmental effect, as said council shall, by regulation, prescribe;
(b) "Municipality" means a city, town or borough of the state and "municipal" has
a correlative meaning;
(c) "Person" means any individual, corporation, limited liability company, joint
venture, public benefit corporation, political subdivision, governmental agency or authority, municipality, partnership, association, trust or estate and any other entity, public
or private, however organized;
(d) "Modification" means a significant change or alteration in the general physical
characteristics of a facility;
(e) "Transmission line tap" means an electrical transmission line not requested by
an applicant to be treated as a facility that has the primary function, as determined by
the council, of interconnecting a private power producing or cogeneration facility to the
electrical power grid serving the state, and does not have a substantial adverse environmental effect, as determined by the council based on a review of the line's proposed
purpose, the line's proposed length, the number and type of support structures, the number of manholes required for the proposed line, the necessity of entering a right-of-way
including any easements or land acquisition for any construction or maintenance on the
proposed line, and any other environmental, health or public safety factor considered
relevant by the council; and
(f) "Emergency generating device" means an electric generating device with a generating capacity of five megawatts or less, installed primarily for the purpose of producing emergency backup electrical power for not more than five hundred hours per year,
and that (1) does not have a substantial adverse environmental effect, as determined by
the council, or (2) is owned and operated by an entity other than an electric, electric
distribution or gas company or (3) is under construction or in operation prior to May
2, 1989.
(1971, P.A. 575, S. 3; P.A. 73-41, S. 1, 2; 73-458, S. 1; P.A. 76-317, S. 1, 2; P.A. 77-218, S. 2; P.A. 79-214, S. 3; 79-
470; P.A. 80-81; P.A. 81-439, S. 4, 14; P.A. 83-569, S. 2, 17; P.A. 84-249, S. 1, 3; P.A. 86-336, S. 7, 19; P.A. 89-61, S.
1, 2; P.A. 94-74, S. 6, 11; P.A. 95-79, S. 50, 189; P.A. 98-28, S. 99, 117; P.A. 99-286, S. 8, 19.)
History: P.A. 73-41 included gas transmission lines with design capability of two hundred pounds per square inch
gauge pressure or more in definition of "facility"; P.A. 73-458 added "which may have a substantial adverse environmental
effect" in Subdiv. (4) of definition of "facility" and defined "modification"; P.A. 76-317 deleted references to length of
lines in Subdivs. (1) and (2) of "facility" definition and rewording provision re pressure of gas transmission lines; P.A.
77-218 added Subdivs. (5) and (6) re community antenna television and telecommunications towers in definition of "facility"; P.A. 79-214 excluded facilities producing one or less megawatt of electricity by cogeneration technology from definition of "facility"; P.A. 79-470 changed height limit for telecommunications towers from one hundred to fifty feet in Subdiv.
(6) of "facility" definition; P.A. 80-81 deleted reference to tower height in Subdiv. (6) of "facility" definition altogether
and included reference to associated equipment; P.A. 81-439 excluded cogeneration facility having capacity of ten megawatts, rather than one megawatt, from definition of facility and limited exclusion to cogeneration and renewable energy
facilities owned and operated by private power producers and qualifying under the Public Utility Regulatory Policies Act
of 1978; P.A. 83-569 redefined "facility" to include certain substations and switchyards; P.A. 84-249 amended Subdiv.
(6) of Subsec. (a) to include telecommunication towers used in a cellular system in the definition of "facility"; P.A. 86-
336 amended Subpara. (iii) of Subdiv. (3) of Subsec. (a) to increase, from ten to twenty-five megawatts of electricity, the
maximum generating capacity which a facility utilizing cogeneration technology must have in order to be excluded from
definition of "facility"; P.A. 89-61 added provisions in Subsec. (a) eliminating transmissions line taps and emergency
generating devices from the jurisdiction of the council and added new Subsecs. (e) and (f) defining a transmission line tap
and an emergency generating device; P.A. 94-74 redefined "facility" to include provision re persons, firms or corporations
certified to provide intrastate telecommunication services, effective July 1, 1994; P.A. 95-79 redefined "person" to include
a limited liability company, effective May 31, 1995; P.A. 98-28 amended Subsec. (f) by adding electric distribution
companies, effective July 1, 1998; P.A. 99-286 amended Subsec. (a)(6) by changing reference to person, firm or corporation
certified by the department to "certified telecommunications provider", effective July 19, 1999.
Cited. 20 CA 474, 488. Cited. 21 CA 85, 87.
Subsec. (a):
Cited. 212 C. 157, 159.
Cited. 20 CA 474, 476. Subdiv. (3) cited. Id., 474, 475, 477, 487.
Cited. 35 CS 303, 307.
Sec. 16-50j. Connecticut Siting Council. Regulations. Consultation with state
agencies. (a) There is established a "Connecticut Siting Council", hereinafter referred
to as the "council", which shall be within the Department of Public Utility Control.
(b) Except for proceedings under chapter 445, this subsection and subsection (c) of
this section and sections 22a-134cc, 22a-134ff and 22a-163 to 22a-163u, inclusive, the
council shall consist of: (1) The Commissioner of Environmental Protection, or his
designee; (2) the chairman, or his designee, of the Public Utilities Control Authority;
(3) one designee of the speaker of the House and one designee of the president pro
tempore of the Senate; and (4) five members of the public, to be appointed by the Governor, at least two of whom shall be experienced in the field of ecology, and not more
than one of whom shall have affiliation, past or present, with any utility or governmental
utility regulatory agency, or with any person owning, operating, controlling, or presently
contracting with respect to a facility, a hazardous waste facility as defined in section
22a-115, a regional low-level radioactive waste facility as defined in section 22a-163a
or ash residue disposal area.
(c) For proceedings under chapter 445, subsection (b) of this section, this subsection
and sections 22a-134cc, 22a-134ff and 22a-163 to 22a-163u, inclusive, the council shall
consist of (1) the Commissioners of Public Health and Public Safety or their designated
representatives; (2) the designees of the speaker of the House of Representatives and
the president pro tempore of the Senate as provided in subsection (b) of this section; (3)
the five members of the public as provided in subsection (b) of this section; and (4) four
ad hoc members, three of whom shall be electors from the municipality in which the
proposed facility is to be located and one of whom shall be an elector from a neighboring
municipality likely to be most affected by the proposed facility. The municipality most
affected by the proposed facility shall be determined by the permanent members of the
council. If any one of the five members of the public or of the designees of the speaker
of the House of Representatives or the president pro tempore of the Senate resides (1)
in the municipality in which a hazardous waste facility is proposed to be located for a
proceeding concerning a hazardous waste facility or in which a low-level radioactive
waste facility is proposed to be located for a proceeding concerning a low-level radioactive waste facility, or (2) in the neighboring municipality likely to be most affected by
the proposed facility, the appointing authority shall appoint a substitute member for the
proceedings on such proposal. If any appointee is unable to perform his duties on the
council due to illness, or has a substantial financial or employment interest which is in
conflict with the proper discharge of his duties under this chapter, the appointing authority shall appoint a substitute member for proceedings on such proposal. An appointee
shall report any substantial financial or employment interest which might conflict with
the proper discharge of his duties under this chapter to the appointing authority who
shall determine if such conflict exists. If any state agency is the applicant, an appointee
shall not be deemed to have a substantial employment conflict of interest because of
employment with the state unless such appointee is directly employed by the state agency
making the application. Ad hoc members shall be appointed by the chief elected official
of the municipality they represent and shall continue their membership until the council
issues a letter of completion of the development and management plan to the applicant.
(d) For proceedings under sections 22a-285d to 22a-285h, inclusive, the council
shall consist of (1) the Commissioners of Public Health and Public Safety or their designated representatives; (2) the designees of the speaker of the House of Representatives
and the president pro tempore of the Senate as provided in subsection (b) of this section,
and (3) five members of the public as provided in subsection (b) of this section. If any
one of the five members of the public or of the designees of the speaker of the House
of Representatives or the president pro tempore of the Senate resides in the municipality
in which an ash residue disposal area is proposed to be located the appointing authority
shall appoint a substitute member for the proceedings on such proposal. If any appointee
is unable to perform his duties on the council due to illness, or has a substantial financial
or employment interest which is in conflict with the proper discharge of his duties under
sections 22a-285d to 22a-285h, inclusive, the appointing authority shall appoint a substitute member for proceedings on such proposal. An appointee shall report any substantial
financial or employment interest which might conflict with the proper discharge of his
duties under said sections to the appointing authority who shall determine if such conflict
exists. If any state agency is the applicant, an appointee shall not be deemed to have a
substantial employment conflict of interest because of employment with the state unless
such appointee is directly employed by the state agency making the application.
(e) The chairman of the council shall be appointed by the Governor from among
the five public members appointed by him, with the advice and consent of the House
or Senate, and shall serve as chairman at the pleasure of the Governor.
(f) The public members of the council, including the chairman, the members appointed by the speaker of the House and president pro tempore of the Senate and the
four ad hoc members specified in subsection (c) of this section, shall be compensated
for their attendance at public hearings, executive sessions, or other council business as
may require their attendance at the rate of one hundred fifty dollars, provided in no case
shall the daily compensation exceed one hundred fifty dollars. The annual compensation
for any member for attending such hearings shall not exceed twelve thousand dollars
a year.
(g) The council shall, in addition to its other duties prescribed in this chapter, adopt,
amend, or rescind suitable regulations to carry out the provisions of this chapter and the
policies and practices of the council in connection therewith, and appoint and prescribe
the duties of such staff as may be necessary to carry out the provisions of this chapter.
The chairman of the council, with the consent of five or more other members of the
council, may appoint an executive director, who shall be the chief administrative officer
of the Connecticut Siting Council. The executive director shall be exempt from classified
service.
(h) Prior to commencing any hearing pursuant to section 16-50m, the council shall
consult with and solicit written comments from the Department of Environmental Protection, the Department of Public Health, the Council on Environmental Quality, the
Department of Public Utility Control, the Office of Policy and Management, the Department of Economic and Community Development and the Department of Transportation.
In addition, the Department of Environmental Protection shall have the continuing responsibility to investigate and report to the council on all applications which prior to
October 1, 1973, were within the jurisdiction of said Department of Environmental
Protection with respect to the granting of a permit. Copies of such comments shall be
made available to all parties prior to the commencement of the hearing. Subsequent to
the commencement of the hearing, said departments, council and commissions may file
additional written comments with the council within such period of time as the council
designates. All such written comments shall be made part of the record provided by
section 16-50o.
(1971, P.A. 575, S. 4; 1972, P.A. 228; June, 1972, P.A. 1, S. 18; P.A. 73-458, S. 2; P.A. 75-375, S. 2, 12; P.A. 76-282,
S. 1, 3; 76-319, S. 1, 2; P.A. 77-223, S. 1, 2; 77-614, S. 19, 155, 162, 284, 323, 587, 610; P.A. 78-303, S. 85, 136; P.A.
80-482, S. 87, 348; P.A. 81-369, S. 3, 20; P.A. 82-209, S. 2, 3; P.A. 83-569, S. 3, 17; P.A. 86-336, S. 1, 19; P.A. 87-540,
S. 24, 26; P.A. 88-102, S. 1, 2; 88-161, S. 1, 2; 88-361, S. 23, 29; P.A. 89-384, S. 11, 15; P.A. 93-381, S. 9, 39; P.A. 95-
250, S. 1; 95-257, S. 12, 21, 58; P.A. 96-211, S. 1, 5, 6.)
History: 1972 acts replaced reference to administrative head of projected environment department and of department
of agriculture and natural resources with commissioner of environmental protection and included members appointed by
house speaker and senate president pro tem in compensation provision under Subsec. (d), replaced water resources, clean
air and state park and forest commissions and board of fisheries and game with department of environmental protection
and deleted "if and when established" referring to council on environmental quality in Subsec. (f); P.A. 73-458 required
that council consult with public utilities and Connecticut development commissions and with office of state planning and
added provision re continued responsibility of environmental protection department in Subsec. (f); P.A. 75-375 substituted
Sec. 16-50m for 16-50p, required that copies of comments be available to parties before hearing and provided for additional
written comments; P.A. 76-282 added reference to compensation for "such other council business as may require their
attendance" in Subsec. (d); P.A. 76-319 replaced public utilities control commission with public utilities control authority
pursuant to requirement of P.A. 75-486 and office of state planning with department of planning and energy policy and
substituted "solicit written comments" for "obtain in writing the comments" in Subsec. (f); P.A. 77-223 required council
to consult with department of transportation in Subsec. (f); P.A. 77-614 and P.A. 78-303 replaced department of planning
and energy policy with office of policy and management and, effective January 1, 1979, replaced department of commerce
with department of economic development, replaced public utilities control authority with division of public utility control
within the department of business regulation, and replaced department of health with department of health services; P.A.
80-482 made division of public utility control an independent department and deleted reference to abolished department
of business regulation; P.A. 81-369 replaced power facility evaluation council with Connecticut Siting Council, inserted
new Subsec. (c) re council as constituted for proceedings under Ch. 445, redesignating remaining Subsecs. accordingly
and required compensation for ad hoc members; P.A. 82-209 amended Subsec. (c) to add provisions re determination of
conflict of interest and re appointment of substitute member where conflict of interest exists; P.A. 83-569 increased members
compensation for hearings to one hundred dollars and limited annual compensation for hearings to not more than four
thousand dollars; P.A. 86-336 amended Subsec. (e) to increase maximum annual compensation from $4000 to $8000; P.A.
87-540 added references to regional low-level radioactive waste facility, effective upon designation of Connecticut as a
host state by the Northeast Interstate Low-Level Radioactive Waste Commission, i.e. December 23, 1987; P.A. 88-102
added a provision to Subsec. (f) which enabled the Connecticut Siting Council to appoint an executive director and provided
that the executive director shall be exempt from classified service; P.A. 88-161 amended Subsec. (e) to authorize compensation for a member's attendance at executive sessions or other council business which requires attendance, to increase daily
compensation to one hundred fifty dollars and to increase annual compensation to a maximum of twelve thousand dollars;
P.A. 88-361 made technical changes in Subsec. (c); P.A. 89-384 authorized selection of public member who is affiliated
with an ash residue disposal area and inserted new Subsec. (d) re proceedings under Secs. 22a-285d to 22a-285h, inclusive,
relettering former Subsecs. (d) to (g) accordingly; P.A. 93-381 replaced department and commissioner of health services
with department and commissioner of public health and addiction services, effective July 1, 1993; P.A. 95-250 and P.A.
96-211 replaced Commissioner and Department of Economic Development with Commissioner and Department of Economic and Community Development; P.A. 95-257 replaced Commissioner and Department of Public Health and Addiction
Services with Commissioner and Department of Public Health, effective July 1, 1995; (Revisor's note: The Revisors
editorially changed a reference in Subsec. (d) from "municipality in which a ash residue disposal area ..." to "municipality
in which an ash residue disposal area ...", to correct a clerical error).
See title 2c re termination under "Sunset Law".
See Sec. 4-9a for definition of "public member".
Cited. 180 C. 474, 477. Cited. 216 C. 1, 2.
Subsec. (g):
Cited. 212 C. 157, 160.
Cited. 20 CA 474, 486, 491.
Sec. 16-50k. Certificate of environmental compatibility and public need.
Transfer. Amendment. Excepted matters. Waiver. (a) Except as provided in subsection (b) of section 16-50z, no person shall exercise any right of eminent domain in
contemplation of, commence the preparation of the site for, or commence the construction or supplying of a facility, or commence any modification of a facility, that may, as
determined by the council, have a substantial adverse environmental effect in the state
without having first obtained a certificate of environmental compatibility and public
need, hereinafter referred to as a "certificate", issued with respect to such facility or
modification by the council, except fuel cells with a generating capacity of ten kilowatts
or less which shall not require such certificate. Any facility with respect to which a
certificate is required shall thereafter be built, maintained and operated in conformity
with such certificate and any terms, limitations or conditions contained therein. Notwithstanding the provisions of this subsection, the council shall, in the exercise of its jurisdiction over the siting of generating facilities, approve by declaratory ruling (1) the construction of a facility solely for the purpose of generating electricity, other than an electric
generating facility that uses nuclear materials or coal as fuel, at a site where an electric
generating facility operated prior to July 1, 1998, and (2) the construction or location
of any fuel cell, unless the council finds a substantial adverse environmental effect.
(b) A certificate may be transferred, subject to the approval of the council, to a
person who agrees to comply with the terms, limitations and conditions contained
therein. The council shall not approve any such transfer if it finds that such transfer was
contemplated at or prior to the time the certificate was issued and such fact was not
adequately disclosed during the certification proceeding.
(c) A certificate issued pursuant to this chapter may be amended as provided in this
chapter.
(d) This chapter shall apply to any facility described in subdivisions (1) to (3),
inclusive, of subsection (a) of section 16-50i, the construction of which is commenced
on or after April 1, 1972, and to any such facility the construction of which is approved
by a municipality that has commenced the sale of bonds or bond anticipation notes on
or after April 1, 1972, the proceeds or part of the proceeds of which are to finance such
construction. This chapter shall apply to any facility described in subdivision (4) of said
subsection (a) of section 16-50i, the construction of which is commenced on or after
July 1, 1983, and to any such facility the construction of which is approved by a municipality that has commenced the sale of bonds or bond anticipation notes on or after July
1, 1983, the proceeds or part of the proceeds of which are to finance such construction.
This chapter shall apply to any facility described in subdivisions (5) and (6) of said
subsection, the construction of which is commenced on or after October 1, 1977, and
to any such facility the construction of which is approved by a municipality that has
commenced the sale of bonds or bond anticipation notes on or after October 1, 1977,
the proceeds or part of the proceeds of which are to finance such construction. This
chapter shall apply to the modification of a facility described in subdivisions (1) to (3),
inclusive, of said subsection (a) for which construction is commenced on or after April
1, 1972, modifications of a facility described in subdivision (4) of said subsection (a)
for which construction is commenced on or after July 1, 1983, and modifications of a
facility described in subdivisions (5) and (6) of said subsection (a) of section 16-50i,
for which construction is commenced on or after October 1, 1977, whenever such modification either alone or in combination with existing or other proposed facility modifications may, as determined by the council, have a substantial adverse environmental effect.
This chapter shall not apply to any matter over which any agency, department or instrumentality of the federal government has exclusive jurisdiction, or has jurisdiction concurrent with that of the state and has exercised such jurisdiction, to the exclusion of
regulation of such matter by the state.
(e) Any person intending to construct a facility excluded from one or more provisions of this chapter may, to the extent permitted by law, elect to waive such exclusion
by delivering notice of such waiver to the council. Such provisions shall thereafter apply
to each facility identified in such notice from the date of its receipt by the council.
(1971, P.A. 575, S. 5; P.A. 73-458, S. 3; P.A. 76-359, S. 4, 7; P.A. 77-218, S. 3; P.A. 83-569, S. 15, 17; P.A. 98-28, S.
49, 117; P.A. 00-93; P.A. 01-49, S. 7.)
History: P.A. 73-458 added exception re Sec. 16-50y in Subsec. (a) and qualified applicability of chapter in Subsec.
(d) with regard to modification of facilities; P.A. 76-359 replaced reference to Sec. 16-50y in Subsec. (a) with reference
to Subsec. (b) of Sec. 16-50z; P.A. 77-218 clarified applicability provisions of Subsec. (d); P.A. 83-569 amended Subsec.
(d) to limit application of chapter to facilities described in Subdiv. (4) of Subsec. (a) of Sec. 16-50i (substations and
switchyards) to those constructed on or after July 1, 1983; P.A. 98-28 amended Subsec. (a) by requiring the council to
approve by declaratory ruling the siting of electric generation facilities that do not use nuclear materials or coal as fuel,
effective July 1, 1998; P.A. 00-93 amended Subsec. (a) by excepting fuel cells with a generating capacity of ten kilowatts
or less and by adding provision re approval by declaratory ruling of the construction or location of fuel cells; P.A. 01-49
amended Subsec. (a) to make technical changes.
Cited. 177 C. 623, 624. Cited. 192 C. 591, 595. Cited. 215 C. 474, 476. Cited. 238 C. 361.
Cited. 37 CA 653, 655; judgment reversed, see 238 C. 361 et seq.
Cited. 35 CS 303, 307, 308, 311.
Subsec. (a):
Cited. 177 C. 623, 630. Cited. 220 C. 516, 521.
Subsec. (b):
Cited. 216 C. 1, 3, 8, 9.
Subsec. (c):
Cited. 177 C. 623, 626, 630.
Subsec. (d):
A period of protection not provided when construction commenced prior to April 1, 1972. 165 C. 687.
Sec. 16-50l. Application for certificate. Notice. Application or resolution for
amendment of certificate. (a) To initiate a certification proceeding, an applicant for a
certificate shall file with the council an application, in such form as the council may
prescribe, accompanied by a fee of not more than twenty-five thousand dollars, which
fee shall be established in accordance with section 16-50t, containing such information
as the applicant may consider relevant and the council or any department or agency of
the state exercising environmental controls may by regulation require, including the
following information: (1) In the case of facilities described in subdivisions (1), (2) and
(4) of subsection (a) of section 16-50i: (A) A description, including estimated costs, of
the proposed transmission line, substation or switchyard, covering, where applicable
underground cable sizes and specifications, overhead tower design and appearance and
heights, if any, conductor sizes, and initial and ultimate voltages and capacities; (B) a
statement and full explanation of why the proposed transmission line, substation or
switchyard is necessary and how the facility conforms to a long-range plan for expansion
of the electric power grid serving the state and interconnected utility systems, that will
serve the public need for adequate, reliable and economic service; (C) a map of suitable
scale of the proposed routing or site, showing details of the rights-of-way or site in the
vicinity of settled areas, parks, recreational areas and scenic areas, and showing existing
transmission lines within one mile of the proposed route or site; (D) justification for
adoption of the route or site selected, including comparison with alternative routes or
sites which are environmentally, technically and economically practical; (E) a description of the effect of the proposed transmission line, substation or switchyard on the
environment, ecology, and scenic, historic and recreational values; (F) a justification
for overhead portions, if any, including life-cycle cost studies comparing overhead alternatives with underground alternatives, and effects described in subdivision (E) of undergrounding; (G) a schedule of dates showing the proposed program of right-of-way or
property acquisition, construction, completion and operation; and (H) identification of
each federal, state, regional, district and municipal agency with which proposed route
or site reviews have been undertaken, including a copy of each written agency position
on such route or site; and (2) in the case of facilities described in subdivision (3) of
subsection (a) of section 16-50i: (A) A description of the proposed electric generating
or storage facility; (B) a statement and full explanation of why the proposed facility is
necessary; (C) a statement of loads and resources as described in section 16-50r; (D)
safety and reliability information, including planned provisions for emergency operations and shutdowns; (E) estimated cost information, including plant costs, fuel costs,
plant service life and capacity factor, and total generating cost per kilowatt-hour, both
at the plant and related transmission, and comparative costs of alternatives considered;
(F) a schedule showing the program for design, material acquisition, construction and
testing, and operating dates; (G) available site information, including maps and description and present and proposed development, and geological, scenic, ecological, seismic,
biological, water supply, population and load center data; (H) justification for adoption
of the site selected, including comparison with alternative sites; (I) design information,
including description of facilities, plant efficiencies, electrical connections to system,
and control systems; (J) description of provisions, including devices and operations, for
mitigation of the effect of the operation of the facility on air and water quality, for waste
disposal, and for noise abatement, and information on other environmental aspects; (K)
a listing of federal, state, regional, district and municipal agencies from which approvals
either have been obtained or will be sought covering the proposed facility, copies of
approvals received and the planned schedule for obtaining those approvals not yet received.
(b) Each application shall be accompanied by proof of service of a copy of such
application on: (1) Each municipality in which any portion of such facility is to be
located, both as primarily proposed and in the alternative locations listed, and any adjoining municipality having a boundary not more than two thousand five hundred feet from
such facility, which copy shall be served on the chief executive officer of each such
municipality and shall include notice of the date on or about which the application is
to be filed, and the zoning commissions, planning commissions, planning and zoning
commissions, conservation commissions and inland wetlands agencies of each such
municipality, and the regional planning agencies which encompass each such municipality; (2) the Attorney General; (3) each member of the legislature in whose assembly or
senate district the facility or any alternative location listed in the application is to be
located; (4) any agency, department or instrumentality of the federal government that
has jurisdiction, whether concurrent with the state or otherwise, over any matter that
would be affected by such facility; (5) each state department, agency and commission
named in subsection (h) of section 16-50j; and (6) such other state and municipal bodies
as the council may by regulation designate. A notice of such application shall be given
to the general public, in municipalities entitled to receive notice under subdivision (1)
of this subsection, by the publication of a summary of such application and the date on
or about which it will be filed. Such notice shall be published under the regulations
to be promulgated by the council, in such form and in such newspapers as will serve
substantially to inform the public of such application and to afford interested persons
sufficient time to prepare for and to be heard at the hearing prescribed in section 16-
50m. Such notice shall be published in not less than ten-point type. A notice of such an
application for a certificate for a facility described in subdivision (3), (4), (5) or (6) of
subsection (a) of section 16-50i shall also be sent, by certified or registered mail, to each
person appearing of record as an owner of property which abuts the proposed primary
or alternative sites on which the facility would be located. Such notice shall be sent at
the same time that notice of such application is given to the general public. Notice of
an application for a certificate for a facility described in subdivision (1) of subsection (a)
of section 16-50i shall also be provided to each electric company or electric distribution
company customer in the municipality where the facility is proposed to be placed. Such
notice shall (A) be provided on a separate enclosure with each customer's monthly bill
for one or more months, (B) be provided by the electric company or electric distribution
company not earlier than sixty days prior to filing the application with the council, but
not later than the date that the application is filed with the council, and (C) include: A
brief description of the project, including its location relative to the affected municipality
and adjacent streets; a brief technical description of the project including its proposed
length, voltage, and type and range of heights of support structures or underground
configuration; the reason for the project; the address and a toll-free telephone number
of the applicant by which additional information about the project can be obtained; and
a statement in print no smaller than twenty-four-point type size stating "NOTICE OF
PROPOSED CONSTRUCTION OF A HIGH VOLTAGE ELECTRIC TRANSMISSION LINE".
(c) An application for a certificate shall contain information on the extent to which
the proposed facility has been identified in, and is consistent with, the annual forecast
reports and life-cycle cost analysis required by section 16-50r and other advance planning that has been carried out, and shall include an explanation for any failure of the
facility to conform with such information.
(d) An amendment proceeding may be initiated by an application for amendment
of a certificate filed with the council by the holder of the certificate or by a resolution
of the council. An amendment application by a certificate holder shall be in such form
and contain such information as the council shall prescribe. A resolution for amendment
by the council shall identify the design, location or route of the portion of a certificated
facility described in subdivisions (1) or (2) of subsection (a) of section 16-50i which is
subject to modification on the basis of stated conditions or events which could not
reasonably have been known or foreseen prior to the issuance of the certificate. No such
resolution for amendment of a certificate shall be adopted after the commencement of
site preparation or construction of the certificated facility or, in the case of a facility for
which approval by the council of a right-of-way development and management plan or
other detailed construction plan is a condition of the certificate, after approval of that
part of the plan which includes the portion of the facility proposed for modification. A
copy and notice of each amendment application shall be given by the holder of the
certificate in the manner set forth in subsection (b) of this section. A copy and notice
of each resolution for amendment shall be given by the council in the manner set forth
in subsection (b) of this section. The council shall also provide the certificate holder
with a copy of such resolution. The certificate holder and the council shall not be required
to give such copy and notice to municipalities and the commissions and agencies of
such municipalities other than those in which the modified portion of the facility would
be located.
(e) At least sixty days prior to the filing of any application with the council, the
applicant shall consult with the municipality in which the facility may be located and
with any other municipality required to be served with a copy of the application under
subdivision (1) of subsection (b) of this section concerning the proposed and alternative
sites of the facility. Such consultation with the municipality shall include, but not be
limited to good faith efforts to meet with the chief elected official of the municipality.
At the time of the consultation, the applicant shall provide the chief elected official with
any technical reports concerning the public need, the site selection process and the
environmental effects of the proposed facility. The municipality may conduct public
hearings and meetings as it deems necessary for it to advise the applicant of its recommendations concerning the proposed facility. Within sixty days of the initial consultation, the municipality shall issue its recommendations to the applicant. No later than
fifteen days after submitting the application to the council, the applicant shall provide
to the council all materials provided to the municipality and a summary of the consultations with the municipality including all recommendations issued by the municipality.
(1971, P.A. 575, S. 6; P.A. 73-458, S. 5; P.A. 75-375, S. 3, 12; 75-509, S. 1, 4; P.A. 76-359, S. 2, 7; P.A. 79-537, S. 1;
P.A. 83-569, S. 4, 17; P.A. 86-187, S. 2, 10; P.A. 89-45, S. 2, 4; 89-104; P.A. 94-176, S. 1; P.A. 98-28, S. 100, 117; P.A.
99-141, S. 2, 4.)
History: P.A. 73-458 amended Subsec. (a) to require statement of how facility conforms to long-range plan for expansion
of power grid in (1)(B), to delete statement of methods of eliminating overhead portions in (1)(F), to delete reference to
statement of applicants understanding of agency's position in (1)(H), to delete requirement that statement of loads and
resources be by area in (2)(C) and to delete requirement for setting out plants costs by accounts and expenses by categories
and amended Subsec. (b) to require that application copies be sent to zoning, planning, zoning and planning and conservation
commissions, to inland wetland and regional planning agencies, to state departments, agencies and commissions named
in Sec. 16-50j(f) and to others designated by council; P.A. 75-375 added references to environmentally, technically and
economically practical routes in Subsec. (a)(1)(D); P.A. 75-509 required that notice in Subsec. (b) "be published in not
less than ten-point, boldface type"; P.A. 76-359 added Subsec. (d); P.A. 79-537 clarified language with minor changes to
Subsecs. (a) and (b), deleted Subsec. (c) summarizing section provisions, relettered Subsec. (d) as (c) and added new
Subsec. (d) re amendments; P.A. 83-569 amended Subsec. (a) to include references to substations and switchyards; P.A.
86-187 amended Subsec. (b) to require council to send notice of certain applications to abutting property owners; P.A. 89-
45 deleted requirement re notices published in boldface type; P.A. 89-104 added new Subsec. (e) re consultation with and
input of municipality concerning proposed or alternative sites of a facility; P.A. 94-176 amended Subsec. (a) by adding
"life-cycle" and "comparing overhead alternatives with underground alternatives" in Subpara. (F), amended Subsec. (b)
by changing Subpara. designations to Subdiv. designations and adding provisions re notice of an application for a certificate,
and amended Subsec. (c) by changing "identified in the annual forecast reports" to "identified in, and is consistent with,
the annual forecast reports and life-cycle cost analysis" and replacing "failure to so identify the facility" with "failure of
the facility to conform with such information"; P.A. 98-28 amended Subsec. (b) by adding electric distribution companies,
effective July 1, 1998; P.A. 99-141 amended Subsec. (b) by adding reference to adjoining municipality having boundary
not more than two thousand five hundred feet from facility and making a technical change in Subdiv. (1) and amended
Subsec. (e) by adding reference to any other municipality required to be served, effective June 8, 1999, and applicable to
applications pending before the Connecticut Siting Council on or after that date.
See chapter 54 re uniform administrative procedure.
Cited. 177 C. 623, 625. Cited. 215 C. 474, 477, 479, 482, 483. Notice requirements and jurisdictional effect discussed.
216 C. 1, 5, 7, 9, 10. Cited. 217 C. 143, 144.
Cited. 20 CA 474, 476, 479.
Subsec. (a):
Cited. 177 C. 623, 630.
Subsec. (b):
Cited. 215 C. 474, 477, 482, 483. Cited. 216 C. 1, 3, 8, 9.
Cited. 20 CA 474, 478480.
Subsec. (c):
Cited. 177 C. 623, 630.
Subsec. (d):
Cited. 37 CA 653, 662; judgment reversed, see 238 C. 361 et seq.
(a) Upon the receipt of an application for a
certificate complying with section 16-50l, the council shall promptly fix a commencement date and location for a public hearing thereon not less than thirty days nor more
than one hundred fifty days after such receipt. At least one session of such hearing shall
be held at a location selected by the council in the county in which the facility or any
part thereof is to be located after six-thirty p.m. for the convenience of the general public.
After holding at least one hearing session in the county in which the facility or any part
thereof is to be located, the council may, in its discretion, hold additional hearing sessions
at other locations. If the proposed facility is to be located in more than one county, the
council shall fix the location for at least one public hearing session in whichever county
it determines is most appropriate, provided the council may hold hearing sessions in
more than one county.
(b) (1) The council shall hold a hearing on an application for an amendment of a
certificate not less than thirty days nor more than sixty days after receipt of the application in the same manner as a hearing is held on an application for a certificate if, in the
opinion of the council, the change to be authorized in the facility would result in any
material increase in any environmental impact of such facility or would result in a substantial change in the location of all or a portion of the facility, other than as provided
in the alternatives set forth in the original application for the certificate, provided the
council may, in its discretion, return without prejudice an application for an amendment
of a certificate to the applicant with a statement of the reasons for such return. (2) The
council may hold a hearing on a resolution for amendment of a certificate not less than
thirty days nor more than sixty days after adoption of the resolution in the same manner
as provided in subsection (a) of this section. The council shall hold a hearing if a request
for a hearing is received from the certificate holder or from a person entitled to be a
party to the proceedings within twenty days after publication of notice of the resolution.
Such hearing shall be held not less than thirty days nor more than sixty days after the
receipt of such request in the same manner as provided in subsection (a) of this section.
(3) The county in which the facility is deemed to be located for purposes of a hearing
under this subsection shall be the county in which the portion of the facility proposed
for modification is located.
(c) The council shall cause notices of the date and location of each hearing to be
mailed, within one week of the fixing of the date and location, to the applicant and each
person entitled under section 16-50l to receive a copy of the application or resolution.
The general notice to the public shall be published in not less than ten point, boldface
type.
(d) Hearings, including general hearings on issues which may be common to more
than one application, may be held before a majority of the members of the council.
(e) During any hearing on an application or resolution held pursuant to this section,
the council may take notice of any facts found at a general hearing.
(1971, P.A. 575, S. 7; P.A. 73-339, S. 1, 2; 73-458, S. 6; P.A. 75-375, S. 4, 12; 75-509, S. 24; P.A. 76-282, S. 2, 3;
P.A. 79-537, S. 2; P.A. 90-254, S. 1.)
History: P.A. 73-339 added provision re hearing location when facility to be in more than one county in Subsec. (a);
P.A. 73-458 added Subsec. (d) requiring majority of members for hearings and proceedings; P.A. 75-375 required that
hearing commence not more than one hundred fifty rather than one hundred eighty days after receipt of application, clarified
applicable hearings under Subsec. (d) and added Subsec. (e) re facts found at general hearing; P.A. 75-509 required one
evening session of hearing in Subsec. (a) and required that published notice be in "not less than ten-point, boldface type";
P.A. 76-282 added proviso in Subsec. (b) re return of application for amendment; P.A. 79-537 clarified language by making
minor changes and amended Subsec. (b) to require hearing on amendment application between thirty and sixty days after
its receipt and to add provisions re hearings on resolutions; P.A. 90-254 made change to specify that the first hearing
session be held in the county in which the facility is located.
Cited. 177 C. 623, 625. Cited. 215 C. 474, 479, 480, 483. Cited. 216 C. 1, 4.
Cited. 37 CA 653, 663; judgment reversed, see 238 C. 361 et seq.
Subsec. (b):
Cited. 177 C. 623, 626, 627, 630.
Subsec. (c):
Cited. 212 C. 157, 159. Cited. 215 C. 474, 482, 483. Cited. 216 C. 1, 5.
Sec. 16-50n. Parties to a certification or amendment proceeding or a declaratory ruling. Grouping of parties. Intervenors. Counsel and consultant to council.
Limited appearances. (a) The parties to a certification or amendment proceeding or
to a declaratory ruling proceeding shall include: (1) The applicant, certificate holder,
or petitioner; (2) each person entitled to receive a copy of the application or resolution
under section 16-50l, if such person has filed with the council a notice of intent to be a
party; (3) any domestic or qualified nonprofit corporation or association formed in whole
or in part to promote conservation or natural beauty, to protect the environment, personal
health or biological values, to preserve historical sites, to promote consumer interests,
to represent commercial and industrial groups or to promote the orderly development
of the areas in which the facility is to be located, if it has filed with the council a notice
of intent to be a party; and (4) such other persons as the council may at any time deem
appropriate.
(b) The council may permit any person to participate as an intervenor, in accordance
with the provisions of section 4-177a, in a certification or amendment proceeding or a
declaratory ruling proceeding.
(c) The council in its discretion may provide for the grouping of parties and intervenors with the same interests. If such a group does not designate an agent for the service
of notice and documents, the council shall designate such an agent, and notice and
documents need be served only on the designated agent. Notwithstanding the provisions
of this subsection, any party or intervenor who has been included in a group may, at
any time by oral or written notice to the council, elect not to be a member of the group
to the extent specified in such notice.
(d) The Attorney General shall appoint an assistant attorney general or a special
assistant attorney general to act as counsel for the Connecticut Siting Council.
(e) Upon receipt of the application, the council may employ one or more independent consultants to study and measure the consequences of the proposed facility on the
environment. The council shall direct such consultant or consultants to study any matter
that the council deems important to an adequate appraisal of the application. Any such
study and any report issued as a result thereof shall be part of the record of the proceeding.
(f) Any person may make a limited appearance at a hearing held pursuant to the
provisions of section 16-50m, prior thereto or within thirty days thereafter, entitling
such person to file a statement in writing. At the discretion of the council any person
may make a limited appearance at any such hearing to present an oral statement under
oath. All papers and matters filed by a person making a limited appearance shall become
part of the record. No person making a limited appearance, and not otherwise entitled
to be a party, shall be a party or shall have the right to cross-examine witnesses, parties
or intervenors.
(1971, P.A. 575, S. 8; P.A. 73-458, S. 7; P.A. 75-375, S. 5, 12; P.A. 79-537, S. 3; P.A. 86-187, S. 6, 10; P.A. 89-45, S.
3, 4; P.A. 90-230, S. 84, 101.)
History: P.A. 73-458 amended Subdiv. (2) of Subsec. (a) to include as parties persons giving notice of intent to be a
party, rather than persons who have not given notice that they do not want to be parties and clarified limited appearances
in Subsec. (d) by replacing reference to appearance "at any time in the proceeding" with reference to appearance before
hearing or within thirty days after hearing and provided that persons making limited appearance are not subject to cross-
examination; P.A. 75-375 deleted fifteen-day deadline for filing of intent to be a party in Subsec. (a)(2), inserted new
Subsec. (b) re grouping of parties and relettered former Subsecs. (b) to (d) as (c) to (e); P.A. 79-537 added references to
amendment proceedings, certificate holders and resolutions in Subsec. (a) and deleted twenty-day deadline for filing of
notice of intent by nonprofit corporations under Subsec. (a)(3); P.A. 86-187 replaced power facility evaluation council
with Connecticut siting council in Subsec. (c); P.A. 89-45 included provision in Subsec. (a) allowing council to issue
declaratory rulings, added Subsec. (b) permitting intervenors in council proceeding, included provision in Subsec. (f) re
limited appearances at hearings to present oral statement and relettered Subsecs. (b), (c), (d) and (e) as Subsecs. (c), (d),
(e) and (f); P.A. 90-230 made technical change to Subsec. (b).
Cited. 177 C. 623, 625.
Subsec. (a):
Cited. 20 CA 474, 486.
Subsec. (d):
Cited. 20 CA 474, 485.
(a) A record shall be made of
the hearing and of all testimony taken and the cross-examinations thereon. Every party
or group of parties as provided in section 16-50n shall have the right to present such
oral or documentary evidence and to conduct such cross-examination as may be required
for a full and true disclosure of the facts.
(b) A copy of the record shall be available at all reasonable times for examination
by the public without cost at the principal office of the council. A copy of the transcript
of testimony at the hearing shall be filed at an appropriate public office, as determined
by the council, in each county in which the facility or any part thereof is proposed to
be located.
(1971, P.A. 575, S. 9; P.A. 75-375, S. 6, 12.)
History: P.A. 75-375 included grouped parties in Subsec. (a) and required transcript copy to be filed at designated
public office in county rather than municipality where facility to be located.
(a) In a certification proceeding, the council
shall render a decision upon the record either granting or denying the application as
filed, or granting it upon such terms, conditions, limitations or modifications of the
construction or operation of the facility as the council may deem appropriate. The council's decision shall be rendered within twelve months of the filing of an application
concerning a facility described in subdivision (1) or (2) of subsection (a) of section 16-
50i or subdivision (4) of said subsection (a) if the application was incorporated in an
application concerning a facility described in subdivision (1) of said subsection (a), and
within one hundred eighty days of the filing of any other application concerning a facility
described in subdivision (4) of said subsection (a), and an application concerning a
facility described in subdivision (3), (5) or (6) of said subsection (a), provided such time
periods may be extended by the council by not more than one hundred eighty days with
the consent of the applicant. The council shall file, with its order, an opinion stating in
full its reasons for the decision. Except as provided in subsection (c) of this section, the
council shall not grant a certificate, either as proposed or as modified by the council,
unless it shall find and determine: (1) A public need for the facility and the basis of the
need; (2) the nature of the probable environmental impact, including a specification of
every significant adverse effect, whether alone or cumulatively with other effects, on,
and conflict with the policies of the state concerning, the natural environment, ecological
balance, public health and safety, scenic, historic and recreational values, forests and
parks, air and water purity and fish, aquaculture and wildlife; (3) why the adverse effects
or conflicts referred to in subdivision (2) of this subsection are not sufficient reason to
deny the application; (4) in the case of an electric transmission line, (A) what part, if
any, of the facility shall be located overhead, (B) that the facility conforms to a long-
range plan for expansion of the electric power grid of the electric systems serving the
state and interconnected utility systems and will serve the interests of electric system
economy and reliability, and (C) that the overhead portions of the facility, if any, are
cost effective and the most appropriate alternative based on a life-cycle cost analysis
of the facility and underground alternatives to such facility, and are consistent with the
purposes of this chapter, with such regulations as the council may adopt pursuant to
subsection (a) of section 16-50t, and with the Federal Power Commission "Guidelines
for the Protection of Natural Historic Scenic and Recreational Values in the Design and
Location of Rights-of-Way and Transmission Facilities" or any successor guidelines
and any other applicable federal guidelines; (5) in the case of an electric or fuel transmission line, that the location of the line will not pose an undue hazard to persons or property
along the area traversed by the line. The terms of any agreement entered into by the
applicant and any party to the certification proceeding, or any third party, in connection
with the construction or operation of the facility, shall be part of the record of the proceedings and available for public inspection. The full text of any such agreement, and a
statement of any consideration therefor, if not contained in the agreement, shall be filed
with the council prior to the council's decision. This provision shall not require the
public disclosure of proprietary information or trade secrets.
(b) (1) Prior to granting an applicant's certificate for a facility described in subdivision (5) or (6) of section 16-50i, the council shall examine, in addition to its consideration
of subdivisions (1) to (5), inclusive, of subsection (a) of this section: (A) The feasibility
of requiring an applicant to share an existing facility, as defined in subsection (b) of
section 16-50aa, within a technically derived search area of the site of the proposed
facility, provided such shared use is technically, legally, environmentally and economically feasible and meets public safety concerns, (B) whether such facility, if constructed,
may be shared with any public or private entity which provides telecommunications
or community antenna television service to the public, provided such shared use is
technically, legally, environmentally and economically feasible at fair market rates,
meets public safety concerns, and the parties' interests have been considered and (C)
whether the proposed facility would be located in an area of the state which the council,
in consultation with the Department of Environmental Protection and any affected municipalities, finds to be a relatively undisturbed area that possesses scenic quality of
local, regional or state-wide significance. The council may deny an application for a
certificate if it determines that (i) shared use under the provisions of subparagraph (A)
of this subdivision is feasible, (ii) the applicant would not cooperate relative to the future
shared use of the proposed facility, or (iii) the proposed facility would substantially
affect the scenic quality of its location and no public safety concerns require that the
proposed facility be constructed in such a location.
(2) When issuing a certificate for a facility described in subdivision (5) or (6) of
subsection (a) of section 16-50i, the council may impose such reasonable conditions as
it deems necessary to promote immediate and future shared use of such facilities and
avoid the unnecessary proliferation of such facilities in the state. The council shall, prior
to issuing a certificate, provide notice of the proposed facility to the municipality in
which the facility is to be located. Upon motion of the council, written request by a public
or private entity which provides telecommunications or community antenna television
service to the public or upon written request by an interested party, the council may
conduct a preliminary investigation to determine whether the holder of a certificate for
such a facility is in compliance with the certificate. Following its investigation, the
council may initiate a certificate review proceeding, which shall include a hearing, to
determine whether the holder of a certificate for such a facility is in compliance with
the certificate. In such proceeding, the council shall render a decision and may issue
orders which it deems necessary to compel compliance with the certificate, which orders
may include, but not be limited to, revocation of the certificate. Such orders may be
enforced in accordance with the provisions of section 16-50u.
(c) (1) The council shall not grant a certificate for a facility described in subdivision
(3) of subsection (a) of section 16-50i, either as proposed or as modified by the council,
unless it finds and determines: (A) A public benefit for the facility; (B) the nature of
the probable environmental impact, including a specification of every significant adverse and beneficial effect that, whether alone or cumulatively with other effects, conflicts with the policies of the state concerning the natural environment, ecological balance, public health and safety, scenic, historic and recreational values, forests and parks,
air and water purity and fish and wildlife; and (C) why the adverse effects or conflicts
referred to in subparagraph (B) of this subdivision are not sufficient reason to deny the
application. For purposes of subparagraph (A) of this subdivision, a public benefit exists
if such a facility is necessary for the reliability of the electric power supply of the state
or for a competitive market for electricity.
(2) The council shall not grant a certificate for a facility described in subdivision
(1) of subsection (a) of section 16-50i which is substantially underground or underwater
except where such facilities interconnect with existing overhead facilities, either as
proposed or as modified by the council, unless it finds and determines: (A) A public
benefit for the facility; (B) the nature of the probable environmental impact, including
a specification of every single adverse and beneficial effect that, whether alone or cumulatively with other effects, conflict with the policies of the state concerning the natural
environment, ecological balance, public health and safety, scenic, historic and recreational values, forests and parks, air and purity and fish and wildlife; (C) why the adverse
effects or conflicts referred to in subparagraph (B) of this subdivision are not sufficient
reason to deny the application; (D) in the case of a new electric transmission line, (i)
what part, if any, of the facility shall be located overhead, (ii) that the facility conforms
to a long-range plan for expansion of the electric power grid of the electric systems
serving the state and interconnected utility systems and will serve the interests of electric
system economy and reliability, and (iii) that the overhead portions of the facility, if
any, are cost-effective and the most appropriate alternative based on a life-cycle cost
analysis of the facility and underground alternatives to such facility and are consistent
with the purposes of this chapter, with such regulations as the council may adopt pursuant
to subsection (a) of section 16-50t, and with the Federal Energy Regulatory Commission
"Guidelines For the Protection of Natural Historic Scenic and Recreational Values in
the Design and Location of Rights-of-Way and Transmission Facilities" or any other
successor guidelines and any other applicable federal guidelines; and (E) in the case of
an electric or fuel transmission line, that the location of the line will not pose an undue
hazard to persons or property along the area traversed by the line. For purposes of
subparagraph (A) of this subdivision, a public benefit exists if such a facility is necessary
for the reliability of the electric power supply of the state or for the development of a
competitive market for electricity.
(d) If the council determines that the location of all or a part of the proposed facility
should be modified, it may condition the certificate upon such modification, provided
the municipalities, and persons residing or located in such municipalities, affected by
the modification shall have had notice of the application as provided in subsection (b)
of section 16-50l.
(e) In an amendment proceeding, the council shall render a decision within ninety
days of the filing of the application or adoption of the resolution initiating the proceeding.
The council shall file an opinion with its order stating its reasons for the decision. The
council's decision shall include the findings and determinations enumerated in subsection (a) of this section which are relevant to the proposed amendment.
(f) A copy of the order and opinion issued therewith shall be served upon each
party and a notice of the issuance of the order and opinion shall be published in such
newspapers as will serve substantially to inform the public of the issuance of such order
and opinion. The name and address of each party shall be set forth in the order.
(g) In making its decision as to whether or not to issue a certificate, the council shall
in no way be limited by the fact that the applicant may already have acquired land or
an interest therein for the purpose of constructing the facility which is the subject of its
application.
(1971, P.A. 575, S. 10; P.A. 73-340, S. 1, 2; 73-458, S. 8; P.A. 75-375, S. 7, 12; P.A. 76-320, S. 1, 2; 76-359, S. 3, 7;
P.A. 77-218, S. 4; P.A. 79-537, S. 4; P.A. 80-483, S. 66, 186; P.A. 83-569, S. 5, 17; P.A. 88-121, S. 1, 3; P.A. 93-268, S.
1; P.A. 94-176, S. 3; P.A. 98-28, S. 50, 117; P.A. 01-120, S. 2, 3.)
History: P.A. 73-340 added Subsec. (d) re irrelevance of applicant's prior acquisition of land; P.A. 73-458 amended
Subsec. (a) to clarify Subdiv. (2) by specifying "significant" adverse effects "whether alone or cumulatively ...", to add
"that will provide, in accordance with the need for adequate and reliable electric service" in Subdiv. (4)(B) and to delete
Subdiv. (6) re conformity of facility location to state and local laws; P.A. 75-375 amended Subsec. (a) to require decision
within ten months rather than one year, to delete reference in Subdiv. (4)(B) to elimination of overhead lines in accordance
with need for adequate and reliable service and to require consistency with purposes of Ch. 277a and adopted regulations
as well as with federal guidelines under Subdiv. (4)(C); P.A. 76-320 made technical change in Subsec. (b) and amended
Subsec. (c) to require publication of notice of issuance of order and opinion rather than publication of copy of order and
opinion; P.A. 76-359 rephrased Subsec. (d); P.A. 77-218 made ten-month deadline applicable to applications for facilities
in Subdivs. (1) to (4), inclusive, of Sec. 16-50i(a), imposed one-hundred-twenty-day deadline for those in Subdivs. (5)
and (6) and made provision for extensions under Subsec. (a); P.A. 79-537 made clear that provisions apply to certification
proceedings, inserted new Subsec. (c) re amendment proceedings and redesignated former Subsecs. (c) and (d) accordingly;
P.A. 80-483 made technical changes; P.A. 83-569 amended Subsec. (a) to establish a time limit for council decisions
affecting substations and switchyards; P.A. 88-121 amended Subsec. (a) increasing the council's time to render decisions
on applications; P.A. 93-268 inserted new Subsec. (b) regarding factors considered in granting and conditions of a certificate
for a facility described in Subdiv. (5) or (6) of Subsec. (a) of Sec. 16-50i and relettered former Subsecs. (b) to (e) as (c) to
(f); P.A. 94-176 amended Subsec. (a) by adding provision in Subpara. (C) of Subdiv. (4) re life-cycle cost analysis of the
facility and underground alternatives; P.A. 98-28 made technical changes in Subsec. (a), added new Subsec. (c) re siting
of electric generating and storage facilities and electric transmission lines which are substantially underground or underwater, and redesignated former Subsecs. (c) to (f) as Subsecs. (d) to (g), effective July 1, 1998; P.A. 01-120 amended Subsec.
(a) by adding aquaculture to items in Subdiv. (2) that council must determine the probable environmental impact upon for
any facility and adding provisions making the terms of any agreement between the applicant and any party to the proceeding
or third party part of the record of the proceeding, effective July 1, 2001.
Cited. 212 C. 157, 160. Cited. 215 C. 474, 476.
Cited. 20 CA 474, 489.
Subsec. (a):
Cited. 20 CA 474, 488, 491.
Subsec. (c):
Cited. 177 C. 623, 626.
Any party may obtain judicial review of an order
issued on an application for a certificate or an amendment of a certificate in accordance
with the provisions of section 4-183. Any judicial review sought pursuant to this chapter
shall be privileged in respect to assignment for trial in the Superior Court.
(1971, P.A. 575, S. 11; 1972, P.A. 108, S. 3; P.A. 73-458, S. 9; P.A. 76-436, S. 360, 681; P.A. 77-603, S. 14, 125.)
History: 1972 act replaced superior court with court of common pleas, effective September 1, 1972, except that courts
with cases pending retain jurisdiction; P.A. 73-458 deleted provisions re rehearing on applications as intermediate step to
judicial review and deleted provision re finding of facts de novo; P.A. 76-436 replaced court of common pleas with superior
court and added reference to judicial districts, effective July 1, 1978; P.A. 77-603 replaced previous provision detailing
procedure for judicial review with statement that review to be obtained in accordance with Sec. 4-183.
Since appellate review for both issuance of original certificates and for amendments thereto is provided for, it is not
intended that application for amendment opens, for all purposes including appellate review, the previously issued granting
of certification. 177 C. 623, 627. Cited. 212 C. 157, 161. Cited. 220 C. 516, 519, 520.
Cited. 37 CA 653, 662, 664; judgment reversed, see 238 C. 361 et seq.
Sec. 16-50r. Report of forecast of loads and resources. Confidential Information. Regulations. Investigation of life-cycle costs for overhead and underground
transmission lines: Scope, hearings, consultants, assessment. (a) Every person engaged in electric transmission services, as defined in section 16-1, electric generation
services, as defined in said section, or electric distribution services, as defined in said
section generating electric power in the state utilizing a generating facility with a capacity greater than one megawatt, shall, annually, on or before March first, file a report on
a forecast of loads and resources which may consist of an update of the previous year's
report with the council for its review. The report shall cover the ten-year forecast period
beginning with the year of the report. Upon request, the report shall be made available
to the public. The report shall include, as applicable: (1) A tabulation of estimated peak
loads, resources and margins for each year; (2) data on energy use and peak loads for
the five preceding calendar years; (3) a list of existing generating facilities in service;
(4) a list of scheduled generating facilities for which property has been acquired, for
which certificates have been issued and for which certificate applications have been
filed; (5) a list of planned generating units at plant locations for which property has been
acquired, or at plant locations not yet acquired, that will be needed to provide estimated
additional electrical requirements, and the location of such facilities; (6) a list of planned
transmission lines on which proposed route reviews are being undertaken or for which
certificate applications have already been filed; (7) a description of the steps taken to
upgrade existing facilities and to eliminate overhead transmission and distribution lines
in accordance with the regulations and standards described in section 16-50t; and (8)
for each private power producer having a facility generating more than one megawatt
and from whom the person furnishing the report has purchased electricity during the
preceding calendar year, a statement including the name, location, size and type of
generating facility, the fuel consumed by the facility and the by-product of the consumption. Confidential, proprietary or trade secret information provided under this section
may be submitted under a duly granted protective order. The council may adopt regulations, in accordance with the provisions of chapter 54, that specify the expected filing
requirements for persons that transmit electric power in the state, electric distribution
companies, and persons that generate electric power in the state utilizing a generating
facility with a capacity of greater than one megawatt. Until such regulations are adopted,
persons that transmit electric power in the state shall file reports pursuant to this section
that include the information requested in subdivisions (6) and (7) of this subsection;
electric distribution companies in the state shall file reports pursuant to this section that
include the information requested in subdivisions (1), (2), (7) and (8) of this subsection;
persons that generate electric power in the state utilizing a generating facility with a
capacity greater than one megawatt shall file reports pursuant to this section that include
the information requested in subdivisions (3), (4), (5) and (8) of this subsection. The
council shall hold a public hearing on such filed forecast reports annually. The council
shall conduct a review in an executive session of any confidential, proprietary or trade
secret information submitted under a protective order during such a hearing. At least
one session of such hearing shall be held after six-thirty p.m. Upon reviewing such
forecast reports, the council may issue its own report assessing the overall status of loads
and resources in the state. If the council issues such a report, it shall be made available
to the public and shall be furnished to each member of the joint standing committee of
the General Assembly having cognizance of matters relating to energy and technology,
any other member of the General Assembly making a written request to the council for
the report and such other state and municipal bodies as the council may designate.
(b) On October 1, 1994, and not less than once every five years thereafter, the council
shall establish a proceeding to investigate and determine life-cycle costs for both overhead and underground transmission line alternatives. The council shall determine the
schedule and scope of the investigation at a publicly noticed meeting held not earlier
than ninety days preceding the first public hearing on the matter. The scope of the
investigation shall include, but not be limited to, an inquiry of all relevant life-cycle costs,
relative reliability, constraints concerning access and construction, potential damage to
the environment and compatibility with the existing electric supply system. As part of
the investigation the council shall hold public hearings which shall afford all interested
parties opportunity to be heard. At least one public hearing shall be held after six-
thirty p.m.
(c) An investigation conducted pursuant to subsection (b) of this section may include the retention of consultants, manufacturers and other experts necessary for the
council to objectively determine the range of life-cycle costs of such alternatives. No
such consultant, manufacturer or expert shall have any financial interest in, or, in the
twelve months preceding the investigation, have engaged in any business, employment
or professional activity for compensation with a corporation, company, association, joint
stock association, partnership or person, or lessee thereof, owning, leasing, maintaining,
operating, managing or controlling poles, wires, conduits or other fixtures, along public
highways or streets, for the transmission or distribution of electric current for sale for
light, heat or power within the state, or with a person, firm or corporation which manufactures such poles, wires, conduits or other fixtures. The council shall apportion and assess
its expenses for consultants, hearing facilities, stenographic reports and other reasonable
and necessary expenses of conducting such an investigation among those persons, firms
and corporations having gross revenues from the retail sale of electric power in excess
of one hundred thousand dollars during the preceding calendar year. The council shall
assess each such person, firm or corporation in proportion of its gross revenues to the
aggregate gross revenues of all such persons, firms and corporations. Each person, firm
or corporation subject to an assessment shall pay its assessed amount not later than thirty
days after receiving notice of its assessment or as specified by the council. Prior to
incurring expenses for which assessments shall be made under this subsection, the council shall review the anticipated expenses at a public meeting, notice of which shall be
given to each person, firm or corporation subject to an assessment. A person, firm or
corporation may object to an assessment made pursuant to this subsection by filing with
the council, not later than thirty days after receiving notice of its assessment, a petition
stating the amount of the assessment to which it objects and the grounds upon which it
claims such assessment is excessive, erroneous, unlawful or invalid. Upon the request
of the petitioner, the council shall hold a hearing. After reviewing the company's petition
and testimony, if any, the council shall issue an order in accordance with its findings.
The petitioner shall pay the council the amount indicated in the order not later than thirty
days after the date of the order.
(d) The council shall remit all payments received pursuant to this section to the
State Treasurer for deposit in the Siting Council Fund. Such payments shall be accounted
for as expenses recovered from electric power suppliers. All payments made under this
section shall be in addition to any taxes payable to the state under chapters 211, 212,
212a and 219.
(e) An assessment unpaid on the due date or any portion of an assessment withheld
after the due date under this section shall be subject to interest at the rate of one and
one-fourth per cent per month or fraction thereof.
(1971, P.A. 575, S. 13; P.A. 75-486, S. 18, 69; P.A. 76-323, S. 1, 2; P.A. 78-119; P.A. 79-214, S. 4; P.A. 81-439, S. 5,
14; P.A. 82-222, S. 5, 7; P.A. 89-291, S. 7; P.A. 94-176, S. 2; May 25 Sp. Sess. P.A. 94-1, S. 103, 130; P.A. 96-46, S. 2;
P.A. 01-144.)
History: P.A. 75-486 required filing of description of methodology used to arrive at load forecasts; P.A. 76-323 replaced
requirement that report be furnished to "persons listed in subdivision (2)(A) of section 16-50l(b)" with list of persons,
departments, agencies etc. to receive report and added provision re hearings to be held on reports; P.A. 78-119 changed
filing deadline from January to March, replaced twenty-year period "next succeeding the date" of report with period
"beginning with the year" of report and added new Subdiv. (2) re data on energy use and peak loads for five previous years,
renumbering former Subdivs. (2) to (6), inclusive, accordingly; P.A. 79-214 added Subsec. (b) re simplified statements of
loads and resources by producers using cogeneration technology; P.A. 81-439 excepted private power producers from ten-
year forecast requirement, repealed Subsec. (b), eliminating reporting by person producing electricity by cogeneration or
use of renewable fuel resources and added provision requiring report by purchaser of electricity from private power producer
having facility generating more than one megawatt; P.A. 82-222 required forecast report to be furnished only to senate
president, house speaker, energy committee members and other general assembly members requesting it, instead of to all
general assembly members; P.A. 89-291 changed annual report from ten-year to a twenty-year forecast of loads and
resources; P.A. 94-176 designated existing provisions as Subsec. (a) and changed reference from Subsec. (f) to Subsec.
(j) of Sec. 16-50j and added Subsecs. (b) to (e) re investigation of life-cycle costs for overhead and underground transmission
line alternatives; May 25 Sp. Sess. P.A. 94-1 amended Subsec. (c) by making technical change; P.A. 96-46 amended
Subsec. (a) to allow a forecast report to consist of an update of the previous year's report, to delete requirement that reports
be furnished to certain officials and to add provision re issuance of a report by the council assessing overall status of loads
and resources to certain members of the General Assembly; P.A. 01-144 amended Subsec. (a) to change application of the
subsection from every person engaged in generating electric power to every person engaged in electric transmission,
generation, or distribution services utilizing a generating facility with a capacity of greater than one megawatt, delete
exception for private power producers, delete report content requirements and change the forecast period for the report
from twenty years to ten years, provide that confidential, proprietary or trade secret information provided under section may
be submitted under a protective order, allow the council to adopt regulations to specify filing requirements for transmitters,
generators, and distributors, require certain information from transmitters, generators, and distributors in the report until
such regulations are adopted, and require the council to review any information submitted under a protective order in an
executive session (Revisor's note: In Subsec. (a), certain references to subdivisions of "this section" were changed editorially by the Revisors to "this subsection" for accuracy).
The
council may give appropriate consideration in all proceedings to (1) the amounts expended by a utility for research on generation and transmission of the form of energy
furnished by it and the environmental effect thereof, (2) the amounts expended by such
utility for promotion, including advertising, of the use of the form of energy furnished
by it and (3) the relationship between such expenditures.
(1971, P.A. 575, S. 14.)
(a) The council shall prescribe and establish
such reasonable regulations and standards in accordance with the provisions of chapter
54 as it deems necessary and in the public interest with respect to application fees,
siting of facilities and environmental standards applicable to facilities, including, but
not limited to, regulations or standards relating to: (1) Reliability, effluents, thermal
effects, air and water emissions, protection of fish and wildlife and other environmental
factors; (2) the methodical upgrading or elimination of facilities over appropriate periods
of time to meet the standards established pursuant to this subsection or other applicable
laws, standards or regulations; and (3) the elimination of overhead electric transmission
and distribution lines over appropriate periods of time in accordance with existing applicable technology and the need to provide electric service at the lowest reasonable cost
to consumers.
(b) The council may adopt regulations or standards in accordance with the provisions of chapter 54, with respect to subdivisions (1) and (2) of subsection (a) of this
section. Such regulations or standards shall be in addition to and not in lieu of any
regulation or standard adopted by any other state or local agency or instrumentality. No
such regulation or standard shall be adopted by the council without one or more public
hearings at which members of the public are given adequate opportunity to be heard.
(c) Expenditures by a utility shall not be considered a necessary and proper expense
for the purpose of computing fair net return on invested capital, if such expenditures
were incurred (1) for fines, forfeitures and other penalties, including legal fees and other
expenses incurred in connection therewith, imposed for failure to comply with any state
or federal environmental or pollution standard or (2) in connection with any action
described in section 16-50k(a) prior to issuance of a certificate therefor.
(1971, P.A. 575, S. 15; P.A. 73-458, S. 10; P.A. 75-375, S. 8, 12; P.A. 88-317, S. 62, 107.)
History: P.A. 73-458 replaced references to repealed Secs. 4-41 to 4-50 with reference to Secs. 4-166 to 4-185, qualified
requirement that overhead lines be eliminated in Subsec. (a)(3) with "in accordance with existing applicable technology"
and replaced reference in Subsec. (b) to Subdivs. (2) and (3) of Subsec. (a) with reference to Subdivs. (1) and (2); P.A.
75-375 deleted "methodical" referring to elimination of overhead lines in Subsec. (a) (3) and added provision for regulations
on "the need to provide electric service at the lowest reasonable cost to consumers"; P.A. 88-317 substituted "chapter 54"
for "sections 4-166 to 4-185, inclusive," in Subsecs. (a) and (b), effective July 1, 1989, and applicable to all agency
proceedings commencing on or after that date.
The
council shall take reasonable steps to insure that each facility for which a certificate has
been issued is constructed, maintained and operated in compliance with such certificate
and any other standards established pursuant to this chapter. Whenever the council
deems it necessary to verify such compliance and whenever the meeting of any such
other standards involves expenses, the person to whom such certificate has been issued
shall be charged with and pay such expenses. The courts are authorized to grant such
restraining orders, and such temporary and permanent injunctive relief, as may be necessary to secure compliance with this chapter and with a certificate issued pursuant to this
chapter. The courts may assess civil penalties in an amount not less than one thousand
dollars per day for each day of construction or operation in material violation of this
chapter, or in material violation of any certificate issued pursuant to this chapter. Civil
proceedings to enforce this chapter may be brought by the Attorney General in the
superior court for any judicial district affected by the violation. The remedies and penalties in this section shall be cumulative and shall be in addition to any other penalties
and remedies available at law, or in equity, to any person.
(1971, P.A. 575, S. 16; P.A. 73-458, S. 11; P.A. 78-280, S. 2, 127.)
History: P.A. 73-458 substituted "established pursuant to this chapter" for "applicable to such facility" as phrase modifying "standards"; P.A. 78-280 replaced "county" with "judicial district".
Sec. 16-50v. Administration expenses. Assessments. Fees. Staff. Consultants.
Studies. (a) All expenses of administering this chapter, including the functions of the
council and its staff, shall be financed as provided in this section.
(b) (1) Before December thirty-first of each year, the council shall review the anticipated amount of expenses attributable to energy facilities for the next fiscal year, excluding expenses under subsection (c), (d), (e), (g) or (h) of this section at a public meeting,
notice of which shall be given to each person subject to assessment under this subsection,
and at which interested persons shall be heard. After the meeting, the council shall
determine the anticipated amount of such expenses and submit its determination to the
joint standing committee of the General Assembly having cognizance of appropriations
and the budgets of state agencies. After the committee completes its review, the council
shall apportion and assess the anticipated amount of expenses among those persons
having gross revenue from the sale of electric power at retail in the state in excess of
one hundred thousand dollars during the preceding calendar year, in the proportion
which the gross revenue of each such person bears to the aggregate gross revenues of
all such persons. Each such person shall pay the assessment in three equal installments
on or before July thirty-first, October thirty-first, and January thirty-first of the fiscal
year. During the fiscal year the council may further apportion and assess the additional
amount of such expenses as could not reasonably have been anticipated prior to the
fiscal year, apportioned in the same manner after notice and hearing in the same manner.
The total of such assessments for any fiscal year shall not exceed one million dollars.
No proceeds from any assessment under this subsection may be used by the council
after June 30, 1984, for any proceedings concerning hazardous waste facilities.
(2) As used in this subdivision, "communications services" means services involving transmitting or receiving signals in the electromagnetic spectrum for a public or
commercial purpose pursuant to a Federal Communications Commission license. Before December thirty-first of each year, the council shall review the anticipated amount
of administrative expenses attributable to facilities used for providing communications
services for the next fiscal year, excluding expenses under subsection (c), (d), (e), (g)
or (h) of this section, at a public meeting, notice of which shall be given to each person
subject to assessment under this subsection, and at which interested persons shall be
heard. After the meeting, the council shall determine the anticipated amount of such
expenses and submit its determination to the joint standing committee of the General
Assembly having cognizance of matters relating to appropriations and the budgets of
state agencies. The council shall apportion and assess the anticipated amount of expenses
equitably in proportion to the frequency of appearance, the degree of regulation required
and the percentage of the council's workload, among those persons which provide communications services and have come before the council in the preceding calendar year.
Each such person shall pay the assessment and submit a return, on a form prescribed
by the council, to the council in four equal installments, on or before July 1, 1994, and
July thirty-first of each year thereafter, October 31, 1994, and October thirty-first of
each year thereafter, January 31, 1995, and January thirty-first of each year thereafter,
and April 30, 1995, and April thirtieth of each year thereafter. The council shall transfer
all payments received pursuant to this section to the Treasurer who shall credit such
payments to the Siting Council Fund. Such payments shall be considered administrative
expenses recovered from communications services providers.
(c) The fee for each application for a certificate for a facility described in subdivisions (1) to (4), inclusive, of subsection (a) of section 16-50i, shall be used to meet the
expenses of the council in connection with the review of, hearing on and decision on
the application, including the expenses of any consultant employed by the council under
subsection (d) of section 16-50n. The council shall, by regulation, adjust the fees to meet
the expenses. In addition, the council may assess the applicant during the proceeding on
the application and thereafter, as may be necessary to meet the expenses. The amount
of any fees and assessments paid under this subsection which are in excess of the expenses of the council in reviewing and acting upon the application for which the fees
and assessments were paid shall be refunded within sixty days after completion of the
matter.
(d) The fee for each application for a certificate for a facility described in subdivisions (5) and (6) of subsection (a) of section 16-50i or for a determination regarding
shared use of a facility used for providing communications services, as defined in subdivision (2) of subsection (b) of this section, shall be established by regulation and used
for the administrative expenses of the council and its staff incurred in processing the
application or determination. In the event a hearing is held on any such application or
determination, the council may assess an applicant during the proceeding and thereafter
for all expenses of the council in connection with the review of, hearing on and decision
on such application or determination, including the expenses of any consultant employed
by the council pursuant to subsection (d) of section 16-50n.
(e) With regard to any facility described in subsection (a) of section 16-50i, the
council shall, by regulation, establish such filing fees and provide for such assessments
as may be necessary to meet the expenses of the council and its staff in reviewing and
acting upon each application for an amendment of a certificate, each statement of intent
to acquire property prior to the issuance of a certificate, each petition for an advisory
ruling, each notice of modification and each appeal pursuant to subsection (d) of section
16-50x. The amount of any fees and assessments paid under this subsection which are
in excess of the expenses of the council in reviewing and acting upon the application,
statement of intent, petition for an advisory ruling, notice of modification or appeal for
which the fees and assessments were paid shall be refunded within sixty days after
completion of the matter.
(f) The council shall obtain such full-time and part-time staff and consultants as
may be appropriate to carry out its duties and the provisions of this chapter.
(g) The council may undertake such studies as it deems necessary to carry out its
duties under subdivision (2) of subsection (a) of section 16-50t. The council shall apportion and assess its expenses for consultants, hearing facilities and stenographic reports
and other reasonable and necessary expenses to carry out its duties under subsection (a)
of section 16-50t among those persons having gross revenue from the sale of electric
power at retail in excess of one hundred thousand dollars during the preceding calendar
year, in the proportion which the gross revenue of each such person bears to the aggregate
gross revenues of all such persons. Each such person shall pay the assessment within
thirty days. Before incurring expenses for which assessments will be made under this
subsection, the council shall review the anticipated expenses at a public meeting, notice
of which shall be given to each person subject to the assessment, and at which interested
persons shall be heard.
(h) With regard to any facility described in subsection (a) of section 16-50i, the
council shall, by regulation, establish such fees and assessments as are necessary to
meet the expenses of the council and its staff in conducting field inspections of (1) a
certified project constructed pursuant to a development and management plan or (2) a
completed project for which a declaratory or advisory ruling has been issued.
(1971, P.A. 575, S. 17; P.A. 73-458, S. 12; P.A. 77-276, S. 1, 2; P.A. 81-317, S. 1, 2; 81-369, S. 14, 20; P.A. 82-314,
S. 33, 63; P.A. 83-235, S. 5, 6; P.A. 84-249, S. 2, 3; P.A. 85-466, S. 2, 3; P.A. 86-187, S. 3, 10; 86-403, S. 34, 132; P.A.
90-254, S. 2, 3; P.A. 92-232, S. 2, 3; P.A. 93-361, S. 15, 17; 93-435, S. 68; June 18 Sp. Sess. P.A. 97-11, S. 61, 65; P.A.
00-174, S. 47, 83.)
History: P.A. 73-458 added Subsecs. (b) and (c) re staff and studies; P.A. 77-276 divided former Subsec. (a) into (a)
and (b), redesignating former Subsecs. (b) and (c) accordingly, and clarified expenses of council and detailed manner of
meeting expenses by assessments and fees; P.A. 81-317, in Subsec. (a) increased fee assessment ceiling from two to four
hundred thousand dollars, required review of council's anticipated expenses by appropriations committee and prohibited
use of assessment proceeds for hazardous waste facilities after June 30, 1984, clarified Subsec. (b) and added new Subsec.
(c), concerning assessments of applicants for certificates of environmental compatibility and public need; P.A. 81-369
inserted new Subsec. (c) to establish a procedure for assessment for expenses incurred in processing an application for a
certificate of public safety and necessity for a hazardous waste disposal facility, relettering remaining Subsecs. accordingly,
and made provisions applicable to Ch. 445 proceedings; P.A. 82-314 changed name of appropriations committee; P.A.
83-235 amended Subsec. (d) to repeal the provision requiring that the cost of regulations be assessed among applicants in
the first fiscal year that hazardous waste facility applications are filed; P.A. 84-249 relettered subsections, changed deadline
in Subsec. (b) for council review of anticipated expenses from June thirtieth to December thirty- first, transferred provisions
re regulations re filing fees and assessments from Subsec. (c) to Subsec. (e) and added Subsec. (i) re regulations re fees and
assessments for field inspections; P.A. 85-466 removed provisions relating to council's proceedings concerning hazardous
waste facilities under chapter 445 throughout section, deleting former Subsec. (f) entirely and relettering remaining Subsecs.
accordingly; P.A. 86-187 amended Subsec. (b) to increase limit on total assessments for any fiscal year from four hundred
thousand dollars to five hundred thousand dollars; P.A. 86-403 made technical changes to Subsecs. (a) and (b); P.A. 90-
254 amended Subsec. (b) to increase limit on total assessments for any fiscal year from five hundred thousand dollars to
seven hundred thousand dollars; P.A. 92-232 amended Subsec. (b) to increase limit on total assessments for any fiscal
year from seven hundred thousand dollars to one million dollars; P.A. 93-361 made existing Subsec. (b) into Subdiv. (1)
and added new Subdiv. (2) re assessment of communications services for expenses of the council, amended Subsec. (d)
to include determinations regarding shared use of facility used to provide communications services and amended Subsec.
(e) to add reference to notices of modification, effective July 1, 1993; P.A. 93-435 changed the transfer of payments
received pursuant to this section from the consumer counsel and public utility control fund to the siting council fund; June
18 Sp. Sess. P.A. 97-11 amended Subsec. (b) (2) to change assessment of expenses from an equal assessment to an equitable
assessment i |